Up Coming Projects

Name Of The
Sub-project

Total Cost          (In Lac)

Development of  of  3 nos. of road with adjacent drain at 1 no.  ward

 

1. Dev. Of Tandachri Road with adjucent drain  (Ch.0-00 to 1-372 Km.)

348.68

2. Dev. Of Durga bari/Amanat Ali Master Bari And Saittanonda Ashrom Road and Foteybad Station  Road (Ch.0-00 to 1-637 Km.)

 

255.95

3. Dev. Of Fela Gazi Sodu para Fokirkill, Safor ali, Chand miar Bari, Niaji Buri, Fateabad College Road (Ch.0-00 to 0-959 Km.)

 

193.18

Sub-total (1-3)

797.81

Development of  of  10 nos. of road with adjacent drain at 2 no.  ward

 

4. Dev.Of Chandra Nagor And Chowdhury Nagor Road with drain (Ch.0-00 to 0-914 Km.)

 

196.97

5.  Dev. Of Bayzid Clipton Garment To Batalion Road  with drain(Ch.0-00 to 0-914 Km.)

 

248.18

6. Dev. Of Khaza Road  with drain(Ch.0-00 to 0-460 Km.)

 

95.30

7. Dev. Of Chadni Cinema Road with drain (Ch.0-00 to 0-610 Km.)

 

65.80

8. Dev. Of Kondokia Khal Par Road  with drain(Ch.0-00 to 0-610 Km.)

 

79.02

9. Dev. Of Ser Shah Coloni Kunguchya R/A Road with drain (Ch.0-00 to 0-610 Km.)

 

91.43

10. Dev. Of Roas From Batalian Road To Shasid Menar To Biozoid Thana  Road To Rubi Gate with drain (Ch.0-00 to 1-220 Km.)

 

331.50

11. Dev. Of Chakreso Kanon Road  with drain(Ch.0-00 to 0-457 Km.)

 

92.61

12. Dev. Of Road From Polytechnical Road To Bangla Bazer Road  with drain (Ch.0-00 to 1-250 Km.)

 

246.95

13. Dev. Of Sersha Colony Road Lane bye lane with drain (Ch.0-00 to 1-800 Km.)

 

429.73

Sub-total (4-13)

1877.49

Development of  of  8 nos. of road with adjacent drain at 3 no.  ward

 

14. Dev, of Vologonj Road  with drain(Ch.0-00 to 0-650 Km.)

 

130.54

15. Dev. of Fakira Badh Jalalabadh Link Road  with drain(Ch.0-00 to 0-450 Km.)

 

111.82

16. Dev. of Sha Habibullah Road  with drain(Ch.0-00 to 0-250 Km.)

 

60.17

17. Dev. of Abdul Karim Munshi Road with drain (Ch.0-00 to 0-350 Km.)

 

79.97

18. Dev. of Shadulla Khan road  with drain(Ch.0-00 to 0-950 Km.)

 

229.24

19. Dev. of Hazee Para Road with drain (Baniar Pull To Asay Canay Awlia College) (Ch.0-00 to 1-200 Km.)

 

295.43

20. Dev. of Saleh Nagor Rood with drain (Hazi Para School To Khondokar Para) (Ch.0-00 to1-400 Km.)

 

335.00

21. Dev. of Absar Uddin Moktar Bari Road with drain (Ch.0-00 to 0-300 Km.)

 

75.00

Sub-total (14-21)

1317.17

Development of  of  9 nos. of road with adjacent drain at 4 no.  ward

 

22. Dev.of Faridar para Lane Bye Lane (Ch.0-00 to 0-356 Km.)

 

65.80

23. Dev. of Chand gong R/A Road and bye lane of Block A (Ch.0-00 to 0-400 Km.)

 

84.28

24. Dev.of Amzad Ali Karani & Golam Ali Nazir  Road (Ch.0-00 to 0-761 Km.)

 

197.29

25. Dev.of Phatania goda Road (Ch.0-00 to 0-450 Km.)

 

95.77

26. Dev. of Riaz Uddin Ukil Road (Ch.0-00 to 1-000 Km.)

 

209.87

27. Dev. of Abdul Latif Road (Ch.0-00 to 0-213 Km.)

 

44.30

28. Dev. of Chand gong R/A Road  Block B & Chandrima R/A Road (Ch.0-00 to 0-384 Km.)

 

65.80

29. Dev. of Fida khan road (Ch.0-00 to 0-212Km.)

 

138.84

30. Dev. of Shamser Para Road (Ch.0-00 to 0-304 Km.)

 

72.92

Sub-total (22-30)

974.874

Development of  of  8 nos. of road with adjacent drain at 5 and 6 no.  ward

 

31. Dev. Of Pathan para road,, A. L Khan Road, By Line (Ch.0-00 to0-850 Km.)

 

217.38

32. Dev. Of Anowara Schoo & Somoner Road, Uttar Muhuri Road By Line (Ch.0-00 to 0-550 Km.)

 

125.00

33. Dev. Of Raja khan Chow. Raod (Ch.0-00 to 0-344 Km.)

 

84.65

34. Dev. Of F I.D.C Road (Ch.0-00 to 0-914 Km.)

 

574.72

35. Dev. Of Abdr Rouf Road (Ch.0-00 to 0-457 Km.)

 

110.32

36. Dev . Of Bahaddar Bari to Khaja road N.M.C School(Ch.0-00 to 0-518 Km.)

 

244.03

37. Dev. Of Bus terminal Road (Ch.0-00 to 0-182 Km.)

 

81.06

38. De. Of Ghasia Para Road (Ch.0-00 to 0-400 Km.)

 

105.57

39. Dev. Of Amin Shorif Raod (Ch.0-00 to 0-854 Km.)

 

214.01

Sub-total (31-39)

1756.74

Development of  of  14 nos. of road with adjacent drain at 7 and 8 no.  ward

 

40. Dev. Of Mahammed Pur Area Road(Ch.0-00 to 0-610 Km.)

 

130.00

41. Dev. Of rowfobad
(Paharika Housing Society Road Lane By Lane  Road )(Ch.0-00 to 0-457 Km.)

 

200.00

42. Dev. Of Hill View Road (Bibir Hat Bazar Lane )(Ch.0-00 to 0-701 Km.)

 

190.00

43. Dev. Of Sadullah Khan Road & By Lane(Ch.0-00 to 0-366 Km.)

 

169.51

44. Dev. Of Bayzid Thana Road(Ch.0-00 to 0-609 Km.)

 

80.00

45. Dev. Of Abdul Hamid Road (Ch.0-00 to 0-580 Km.)

112.46

46. Dev. Of Nur Ahamad Road Al-Flah Gali Main Road(Ch.0-00 to 0-366 Km.)

 

72.56

47. Dev of Sugandha R/A Road(Ch.0-00 to 0-456 Km.)

 

77.77

48. Dev. Of Zaker Hossain Road to Nasirabad Girls Scool (Ch.0-00 to 0-426 Km.)

 

71.28

49. Dev. of Mohammed Zaman Road(Ch.0-00 to 0-396 Km.)

 

65.86

50. Dev. Of Ahmed Maih Primary School Road(Ch.0-00 to 0-274Km.)

 

83.72

52. Dev. of Coxmo Politan R/A Road(Ch.0-00 to 0-412 Km.)

 

73.04

53. Dev. of Rahaman Nagar Road By lane(Ch.0-00 to 0-730 Km.)

 

113.66

54. Dev. Of Polytechnical Road (Ch.0-00 to 1-012Km.)

 

521.03

Sub-total (40-54)

1960.89

Development of  of  10 nos. of road with adjacent drain at 9 and 10 no.  ward

 

55. Dev. Of Bisho Colony Road, Lane By Lane(Ch.0-00 to 2-500 Km.)

 

583.41

56. Dev. Of Firoj Sha Road By Lane(Ch.0-00 to 0-914 Km.)

 

119.17

57. Dev. Of Foyz Lake Road By Lane(Ch.0-00 to 0-914 Km.)

 

110.09

58. Dev. Of Sahidullah Khan Road, Islampur Road, Abdul Ali Nagar Road, Noapara Road (Ch.0-00 to 1-400 Km.)

 

138.22

59. Dev. Of Lake City Road(Ch.0-00 to 1-695 Km.)

 

322.79

60. Dev. Of Akborsha Road(Ch.0-00 to 0-914 Km.)

 

278.02

62. Dev. Of Mali Para And New Sahid Lane Road(Ch.0-00 to 0-609 Km.)

 

73.84

62. Dev. Of Egol Star Road(Ch.0-00 to 0-915 Km.)

 

113.53

63. Dev. of Road with Cons. Of protection wall at Zakir Ali Road Side (Part)(Ch.0-00 to 0-357Km.)

 

164.92

64. Dev. Of Ujir Ali Drain And Shen Bari Road (Ch.0-00 to 0-271 Km.)

 

85.00

Sub-tptal (55-64)

1988.99

Development of  of  9 nos. of road with adjacent drain at 11 no.  ward

 

65. Dev. Of Halisahar A Block 2 No Road (Ch.0-00 to 0-366Km.)

256.75

66. Dev. Of Sadu chy. Road(Ch.0-00 to 0-427 Km.)

110.00

67. Dev.Of  Chowdhury Bari Majid Road (Ch.0-00 to 0-609 Km.)

165.00

68. Dev. Of Shahid Nagar Road(Ch.0-00 to 0-365 Km.)

85.00

69. Dev. Of Khal Par Road (Ch.0-00 to 0-214 Km.)

107.00

70. Dev. Of Pran Hari Das Road (Ch.0-00 to 0-214 Km.)

62.00

71. Dev. Of A Block H.S. South Road (Ch.0-00 to 0- 244 Km.)

105.00

72. Dev. Of Ali Ahmed Road (Ch.0-00 to 0-183Km.)

50.00

73. Dev. Of H. & S. Road up to Gaosia Culvert (Ch.0-00 to 0-300 Km.)

75.00

Sub-total (65-73)

1015.75

Development of  of  6 nos. of road with adjacent drain at 12 no.  ward

 

74. Dev. Of Abdus Salam Master Road basamia Road, Sarag Road, Abdus Gani Road at 12 No Ward. (Ch.0-00 to1-100 Km.)

 

249.51

76. Dev. Of Pran Hari Das Road lane by lane (Ch.0-00 to 0-350 Km.)

 

64.83

77. Hazee Ashraf Ali road & by lane (Ch.0-00 to 0-700 Km.)

 

119.17

78. Dev. Of Jarna para lane by lane (Ch.0-00 to 0-980 Km.)

 

106.13

79. Dev. Of Bacha mia road and by lane (Ch.0-00 to 1-825Km.)

 

125.39

80. Dev. Of Uttor saraipara Lane By lane (Ch.0-00 to 0-600 Km.)

 

113.53

Sub-total (74-80)

778.56

Development of  of  7 nos. of road with adjacent drain at 13 no.  ward

 

81. Dev of South Khulshi R/A Lane bye Lane  (Ch.0-00 to 0-960 Km.)

 

235.72

82. Dev. Of Krisnachura, Mehedinager and Sea-beach R/A Road (Ch.0-00 to 1-150 Km.)

 

266.30

83. Dev. Of Nasirabad Properties H/S Road (Ch.0-00 to 0-800 Km.)

 

226.92

84. Dev. Of West Khulshi R/A Lane bye Lane  (Ch.0-00 to 0-400 Km.)

 

75.96

85. Dev. Of Flora Pass Road (Rest Portion) (Ch.0-00 to 1-250 Km.)

 

266.41

86. Dev. Of road Starting from Jhawtola School up to Zakir Hossain Road Via Railway Godaun (Ch.0-00 to 0-553 Km.)

 

75.95

87. Dev.of road Sardhar Bahadur Nagor R/E (Ch.0-00 to 0-400 Km.)

 

41.48

Sub-total (81-87)

1188.74

Development of  of  15 nos. of road with adjacent drain at 15 and 16 no.  ward

 

88. Dev. Of Connectiong Road from CDA Avenue Upto Tiger Pass Road (Ch.0-00 to 0-389.41 Km.)

 

135.00

89. Dev. Of Motizorna Main Road (Ch.0-00 to 0-975.12 Km.)

 

184.94

90. Dev. Of tankir Pahar Road (Ch.0-00 to 0- 807.92 Km.)

 

111.01

91. Dev. Of Sujan R/A Main Road Highway Socity. Road and CDA Ave. by lane (Ch.0-00 to 0-554.86 Km.)

 

107.73

92. Dev. Of Bagghona Roda (Part) East & West high level Road and Chanmari Road by Laner (Ch.0-00 to 2-039.02 Km.)

 

235.52

93. Dev. Of Kusumbag R/A, Baitul Aman R/A and Shah Garibullah H/S Road (Ch.0-00 to 3-338.41 Km.)

 

309.00

94. Dev. Of subarna R/.A Road (Ch.0-00 to 0-382 m.)

 

39.45

95. Dev.of Nurbag R/A Road (Ch.0-00 to 0-295 m.)

 

46.75

96. Dev of Dhopa para Mandir Road (Ch.0-00 to 0-230m.)

 

38.77

97. Dev. Of Madoban gali Road  (Ch.0-00 to 0-276 m.)

 

38.66

98. Dev of Mehidibag road kazirdewry to chatteswaree more (Ch.0-00 to 0-524 m.)

 

114.61

99. Dev. Of mehidibag Lane bye lane (Ch.0-00 to 1-128m.)

 

134.49

100. Dev. Of mehidibag's govt. colony Adjecent R/A Road (Ch.0-00 to1-017m.)

 

138.94

101. Dev. Of M.M Ali Road. (Ch.0-00 to 0-609.76 m.)

 

145.61

102. Dev.of Anjuman Mofidul Islam Road(Ch.0-00 to 0-308.88 m.)

 

145.11

Sub-total  (88-102)

1925.593

 

Development of  of  10 nos. of road with adjacent drain at 16 and 17 no.  ward

 

103. Dev. of Katalgong R/A Roads (Road No 3, 4 and drain of 16 no Chalkbazar Word (Ch.0-00 to 0-930 km.)

 

552.19

104. Dev. Of Santinogor Khurshed meah Road at 17 no West Bakolia Word  (Ch.0-00 to 0-640 Km.)

 

179.04

105. Dev. Of Younus Road lane by lane at 17 no. West Bakolia word.  (Ch.0-00 to 0-457 Km.)

 

121.89

106. Dev. Of Road at Retaining wall Adjacant to Shurobi R/A Khalpar (Ch.0-00 to 0-086 Km.)

 

102.28

107. Dev. Of lane By Lane Adjacant to Aman Ali Road (Ch.0-00 to 0-400 Km.)

 

92.39

108. Dev. Of Lane By Lane Adjacant to D.C. Road And Nurul Hoq Moszid Road, Can Mia Munshi Lane, Ali Newg Lane (Ch.0-00 to 0-800 Km.)

 

164.09

109. Dev. Of Rasul Bag Lane bye Lane (Ch.0-00 to 0-600 Km.)

 

100.51

110. Dev. Of Nirapod & Madina Mosque 2 Lane bye Lane (Ch.0-00 to 0-500 Km.)

 

93.76

111. Dev. Of Sadek Shah, Mostfa Bag, Sal Ban Road, Lane By Lane (Ch.0-00 to 0-900 Km.)

 

151.01

112. Dev. Of Daputy Road, Amiru Neesa Road And Arban Ali Road (Ch.0-00 to 1-000 Km.)

 

168.09

Sub-total (103-112)

1725.25

Development of  of 12 nos. of road with adjacent drain at 18 and 19 no.  ward

 

113. Dev of  Mohammad Sharif Road (Ch.0-00 to 0-415 Km.)

 

70.00

114. Dev of waigar para Road (Ch.0-00 to 1-067 Km.)

 

355.00

115. Dev. Of Azim Road  (Ch.0-00 to 0-675 Km.)

 

232.00

116. Dev.of Abdul Gafur Road  (Ch.0-00 to 0-622 Km.)

 

140.00

117.Dev of Chandgaji Road  (Ch.0-00 to 0-500 Km.)

 

115.00

118. Dev. Of Abdul Aziz Road (Ch.0-00 to 0-366 Km.)

 

75.00

119. Devt of Jebal Hossain Road (Ch.0-00 to 0-291 Km.)

 

65.00

120. Dev Of Miya Khan Road (Ch.0-00 to 1-000 Km.)

 

380.00

121. Dev. of Miakhan Raod (Ch.0-00 to 0-850 Km.)

 

325.00

122. Dev. Of Ismail Foyes Road (Ch.0-00 to 0-460 Km.)

 

90.00

123. Dev. Of Abdul Karim Road at 19 no ward (Ch.0-00 to 0-100 Km.)

 

35.00

124. Dev. Of Myder Mill Road at 19 no ward (Ch.0-00 to 0-600 Km.)

 

235.00

Sub-total (113-124)

2117.00

Development of  of 16 nos. of road with adjacent drain at 20 and 21 no.  ward

 

125. Dev. Of Sirazuddulla Road (Ch.0-00 to 1-100 Km.)

 

243.45

126. Dev. Of Koliraparti Road (Ch.0-00 to 0-609 Km.)

 

83.99

127. Dev. Of Valuar Dighi Road (Ch.0-00 to 0-487 Km.)

 

70.01

128. Dev. Of Kazam Ali Road (Ch.0-00 to 0-450 Km.)

 

72.18

129. Dev. Of Kurbanigong Road (Ch.0-00 to 0-460 Km.)

 

49.11

130. Dev. Of Isornandi  & C.N. B.Road (Ch.0-00 to 0-560 Km.)

 

60.93

132. Dev. Of Teri Bazar Road (Ch.0-00 to 0-700 Km.)

 

95.57

133. Dev. Of Subarea Road (Ch.0-00 to 0-350 Km.)

 

50.52

134. Dev. Of Momin Road & JamalKhan Road (Ch.0-00 to 0-914 Km.)

 

215.51

135. Dev. Of S.S. Khaled Road  (Ch.0-00 to 0-760 Km.)

 

165.23

136. Dev. Of Hemsen Lane & Askar Dighir par (Ch.0-00 to 0-730 Km.)

 

67.57

137. Dev. Of Behind Biman Office & Sotodal Road (Ch.0-00 to 0-800 Km.)

 

68.19

138. Dev. Of J. M. Sen Hall By lane  (Ch.0-00 to 0-335 Km.)

 

46.10

139. Dev. Of Jowtala main Road  (Ch.0-00 to 0-520 Km.)

 

70.96

140. Dev. Of Kazi Bari Road (Ch.0-00 to 0-328 Km.)

 

57.33

141. Dev. Of Love Lane Abedin Coloni Main Road (Ch.0-00 to 0-442 Km.)

 

55.56

Sub-total (125-141)

1472.21

Development of  of 8 nos. of road with adjacent drain at 22 and 23 no.  ward

 

142. Dev. Of Juble Road  (Ch.0-00 to 0-897.94 Km.)

 

602.58

143. Dev. Of Nur Ahmed Road (Ch.0-00 to 0-549.39 Km.)

 

197.44

144. Dev. Of J.C. Ghoha Road (Ch.0-00 to 0-340 Km.)

 

181.77

145. Dev. Of Naval Avenue Road  (Ch.0-00 to 0-400 Km.)

 

130.06

146. Dev. Of Motiarpul Chandmia bill & Bonshsal Para Road (Ch.0-00 to 1-127 Km.)

 

120.10

147.Dev. Of Dewanhat by Pass Road (Ch.0-00 to 0-731 Km.)

 

179.20

148. Dev. Of Sk. Mujeb Road (Ch.0-00 to 0-701 Km.)

 

482.02

149. const. Of  Box Culvart At D.T.Road Nasir Kahan Chara

 

127.37

Sub-total (142-149)

2020.54

Development of  of 11 nos. of road with adjacent drain at 24 and 25 no.  ward

 

150. Dev. Of Ramana R/A Road

 

60.59

151. Dev. Of Santibag R/A & and Agrabad Housing Road

 

104.59

152. Dev. Of Cornofuly R/A Road

 

106.28

153. Dev. Of Halishar Road

 

206.14

154. Dev. Of Bashundhara R/A Road

 

134.39

155. Dev. Of Halishar Kacha Road

 

299.41

156. Dev. Of Port Connecting by Lane

 

161.13

157. Dev. Of Rampur Main Road By lane

 

41.00

158. Dev. Of Fakir Goli Road & Lane by lane

 

40.00

159. Dev. Of Connecting Road

 

63.00

160. Dev. Of H Block Road

 

78.00

Sub-total (150-160)

1294.53

Development of  of 5 nos. of road with adjacent drain at 26 no.  ward

 

161. Dev. Of Notunpara Mainna para Sundari para purba sundari para by lane and drain 1, 2, 3, 4, 5, 6, 7, 8 (Part) at 26 no ward

 

107.52

162. Dev. Of Uttara R/A Goluchnpa para (Ch.0-00 to 0-602 Km.)

 

122.81

163. Dev. Of chodhury par abbas par 26 no ward office lane  (Ch.0-00 to 0-602 Km.)

 

120.00

164. Dev. Of M.A Aziz bari Cho. Panchghor para Niajbari Mo (Ch.0-00 to 0-576 Km.)

 

109.39

165. Cons. Of 26no north Halishahar word office and dev. Of B.Block  (Ch.0-00 to 0-50 Km.)

 

120.00

Sub-total (161-165)

579.72

Development of  of 2 nos. of road with adjacent drain at 27 no.  ward

 

166. Dev. Of Agrabad C.D.A R/A Road at ward No. 27 (Ch.0-00 to 1-095 Km.)

 

379.82

167. Dev. Of Halishar road at ward no. 27 (Ch.0-00 to 1-475 Km.)

 

318.30

Sub-total (166-167)

698.12

Development of  road with adjacent drain at 28 no.  ward

 

168. Dev. Of Shek Alomgir Road, Jadughar area road & Commerce College road at 28 no. ward.  (Ch.0-00 to 2-135 Km.)

 

752.84

Sub-total (168)

752.84

Development of  of 10 nos. of road with adjucent drain at 29,30 and 31 no.  ward

 

169. Dev. Of Madarbari Strand Road (Partial) at 29 no Ward  (Ch.0-00 to 0-425 Km.)

 

206.71

170. Dev. Of Madarbari 1no 2 no road at 29 no ward  (Ch.0-00 to 0-823 Km.)

 

218.17

171. Dev. Of Stand road by lane Imran Road, up to Daroghahat Road  (Ch.0-00 to 1-260 Km.)

 

214.56

172. Dev. Of Bangal Para road by lane, kazidepo lane sadargat  (Ch.0-00 to 1-000 Km.)

 

117.91

173. Dev. Of North Nala para road cane by lane up to kanal gate  (Ch.0-00 to 0-900 Km.)

 

99.34

174. Dev. Of Omar chand Road  (Ch.0-00 to 0-230 Km.)

 

56.04

175. Dev. Of Sharwardi Road and Alkorn by lane  (Ch.0-00 to 0-310 Km.)

 

79.96

176. Dev. Of New market circle with station Road  (Ch.0-00 to 1-000 Km.)

 

211.06

177. Dev. Of Sadarghat Road  (Ch.0-00 to 0-800 Km.)

 

87.70

178. Dev. Of Kobie Nazrul Islam Road and P.K Sen Colony Road  (Ch.0-00 to 0-420 Km.)

 

73.59

Sub-total (169-178)

1365.04

Development of  of 9 nos. of road with adjacent drain at 32,33 and 34 no.  ward

 

179. Dev. Of Nagir Ahamad Chy. Road, Satish Babu Lane, Bador Paty Road, Old Girja Road, Raja Pukur Road Lane (Ch.0-00 to 2-000 Km.)

 

420.00

180. Dev Of Lal Digi Road, Mirinda Lane Road, Hajari Lane Road  (Ch.0-00 to 1-800 Km.)

 

560.00

181. Dev Of Court Road, J.M.Sen Road, Momin Road, Tali Gram Road (Ch.0-00 to 1-900 Km.)

 

750.00

182. Dev. Of Shiv bari road, Alkara 1no Goli, Tech para Road (Ch.0-00 to 1-646 Km.)

 

134.51

183. Dev. Of Avoy Mittro Road, Bridge Ghat Road

 

517.52

184. Dev. Of Alkoron 2, 3 No Goli Balnging Ghat Road,Suja Katghor Road, Haji Colony Road (Ch.0-00 to 1-067 Km.)

 

300.00

185. Dev. Of Nasumeah road Lein by Leen  (Ch.0-00 to 0-915 Km.)

 

176.04

186. Dev. Of Iqbal road (Ch.0-00 to 0-765 Km.)

 

77.04

187. Dev. Of Brick field Road and Re-constrution of drain with slab lane by lane  (Ch.0-00 to 0-708 Km.)

 

120.38

Sub-total (179-187)

3055.49

Development of  of 7 nos. of road with adjacent drain at 35 no.  ward

 

188. Dev. Of AsadGonj Road To Chaktai Road with adjucent drain (Ch.0-00 to 0-760 Km.)

 

85.00

189. Dev. Of Fokhruddin  Road with adjucent drain (Ch.0-00 to 0-800 Km.)

 

90.00

190. Dev. Of Bhanger Pool To Police Bit with adjucent drain(Ch.0-00 to 0-400 Km.)

 

50.00

191. Dev. Of Haji Sobahan Sw.Road To Rajakali Road with adjucent drain (Ch.0-00 to 1-500 Km.)

 

440.00

192. Dev. Of Sk. Mosharaf Hossain Road with adjucent drain(Ch.0-00 to 0-230 Km.)

 

70.00

193. Dev. Santi Sw. And Nur Akter Road with adjucent drain(Ch.0-00 to 0-200 Km.)

 

60.00

194. Dev. Of  Sahid N.M.M.J College Road at 35 no ward with adjucent drain(Ch.0-00 to 1-200 Km.)

 

600.00

Sub-total (188-194)

1395

Development of  of road with adjacent drain at 36 no.  ward

 

194. Dev. Of Road with drain Barik Building by lane under 36 no Gosaildanga ward  (Ch.0-00 to 0-610 Km.)

 

252.59

Sub-total (194)

252.59

Development of 8nos of road with adjucent drain at 37 no. and 38 no.  ward

 

195. Dev. of M.A Aziz Mosque to Ananda bazar Road (Ch.0-00 to 1-800 Km.)

279.85

196. Dev. of M. A Aziz & Abdul Zalil Road remaining Part (Ch.0-00 to 1-000 Km.)

114.70

197. Dev. of Abdul Latif Road work Remaining Portion (Ch.0-00 to 1-500 Km.)

169.56

198. Dev. of Abdul Gofur Shah Road work Remaining Portion (Ch.0-00 to 1-500 Km.)

169.56

199. Dev. of Khandar Para road to Abdul Gafur Shah Raod work (Ch.0-00 to 1-000 Km.)

114.70

200. Dev. of Khandakar para Road (Ch.0-00 to 1-000 Km.)

114.70

201. Dev. Of Abdul Khalek Road (Ch.0-00 to 1-200 Km.)

 

244.99

202. Dev. Of Halishahar Stand Road, Lane By Lane (Ch.0-00 to 1-000 Km.)

 

207.63

Sub-total (195-202)

1415.69

 

Development of 20 nos of road with adjacent drain at 39 no. and 40 no.  ward

 

203. Dev. Of Akmal Ali Road  (Ch.0-00 to 2-000 Km.)

 

390.85

204. Dev. Of S. Alam & B Alam Road & by lane  (Ch.0-00 to 0-762 Km.)

 

197.69

205. Dev. Of Road housing Colony To Boribod  (Ch.0-00 to 0-914 Km.)

 

131.47

206 Dev. Of Panirkol, Bibijan & Navi Boundary Road (Ch.0-00 to 0-853 Km.)

 

62.20

207.Dev. Of Ibrahim Saw. Road & Gofur bari to Navy wall Road at Hossain Ahmad Para  (Ch.0-00 to 0-610 Km.)

 

46.32

208.Dev. Of Mokter Hossain, Md Ali & Sardar Bari Road Hossain Ahmed Para (Ch.0-00 to 0-915 Km.)

 

66.00

209. Dev of Samoli housing road

 

50.84

210. Dev. Of Middle hossain ahmed para road by the side of musa hany bari

 

48.82

211. Dev. Of tahar bari lane, nur nabi lane & Arafat lane (Ch.0-00 to 0-640 Km.)

 

75.58

212. Dev. Of Mohajon bari road (Ch.0-00 to 0-213 Km.)

 

50.29

213. Dev. Of road by the side of mohammed ali mazar dabar par (Ch.0-00 to 0-761 Km.)

 

90.83

214. Dev. Of Barma Para Road (Ch.0-00 to 0-609 Km.)

 

110.11

215. Dev. Of yousuf mistri lane sukkur saw. Lane (Ch.0-00 to 0-335 Km.)

 

53.96

216. Dev. Of Hadipara Lane no. 1, 2, 425 (Ch.0-00 to 0-642 Km.)

 

75.52

217. Dev. Of Muslimabad road from Jalapara to Begumgonj Soceity

 

93.25

218. Dev. Of Muslimabad Souly Road

 

52.79

219. Dev. Of Road form Muslimabad Zilani nagar road to jahangir driver Bari

 

83.11

220. Dev. Of Golden bedha road from VIP to baribad

 

95.56

221. Dev. Of Dhumpara Haji Goli

 

55.84

222. Dev. Of East hossain ahamed para harun para & nur mohammed Lane

 

74.15

Sub-total (203-222)

1905.18

Development of 12 nos of road with adjacent drain at 41no.south potenga ward

 

223. Dev. Of Charbasti 14 no Colony Road

 

107.18

224. Dev. Of Nizam Market  Road

 

84.56

225. Dev. Of Foul chury para Road

 

92.13

226. Dev. Of Road from dail para chadi halda to foulchuri para sea beach

 

266.29

227. Dev. of Chotihalda Road

 

100.00

228. Dev. Of old mosque Road

 

88.74

229. Dev. of Maizpara Jalalia School Road

 

58.09

230. Dev. Of Dail para Prinary School Road

 

90.17

231. Dev. Of Charpara main Road

 

170.00

232. Dev. Of Foulchory Para slag Road

 

80.81

233. Dev. Of Abdullah, Maiz Para & Chy. Para (Ch.0-00 to 1-220 Km.)

 

260.53

234. Dev. Of Ptanga Power Plant Road And Char Basti Pacific Oil Road (Ch.0-00 to 0-700 Km.)

 

146.18

Sub-total (223-234)

1544.68

Total road Component(234 nos of Roads)

37176.50

Retaining wall

 

Construction/Re-construction of 6 nos. of Retaining wall at 1,2,3,4 and 5no. ward

 

235. Construction of Balu Khaly Chora R/W at 1 no ward

 

296.15

236.Construction Of Retaining Wall At Shersha Khal at 2 no ward

 

242.00

237.Construction of Hazeer Pull Baman Shahea Link Khal at 3 no ward

 

591.04

238. Construction of Dom Khal Retaining Wall  at 4 no ward

 

440.00

239.Construction of Chan Miya Shodagor R/W at 4 no ward

 

260.00

240.Construction of Dewan Mohsin Road Khal R/W at 5 no ward

 

387.99

Sub-total (235-240)

2217.18

Construction/Re-construction of 4 nos. of Retaining wall at 6,7 and 8 no. ward

 

241.Construction of R/W Of Birja Khal (Omar Ali Matobber Road To Paharttay Pool) at 6 no ward

 

563.48

242.Construction of Tripura Khal R/W at 7no ward

 

577.64

243.Construction of Nasirabad H/S 03 NO Road To Mirza Khal R/W at 8 no ward

 

215.00

244.Construction of Mirja Khal R/W at 8 no ward

 

157.67

Sub-total (241-244)

1513.79

Construction/Re-construction of 4 nos. of Retaining wall at 9,10 and 13 no. ward

 

245.Construction of Kalir Chora, Gahanar Chora, Gynar Chora R.C.C. R/W at 9 no ward

 

785.00

246.Construction Of R/W In Polish Beat, Rail School Adjacent Khal at 9no ward

 

1013.00

247. Construction of R/W of Nezir Khal   at 10 no ward

 

467.12

Sub-total (245-247)

2265.12

Construction/Re-construction of 2nos. of Retaining wall at 12 and 14 no. ward

 

248. Construction Of Drain At Pahartoli Bazer, Near Ahmed Chowdury Road To Azob Bahar Khal At 12 No ward

 

336.00

249. Construction of High Lavel Road R/W at 14 no ward

 

168.00

Sub-total (248-249)

504

Construction/Re-construction of 4 nos. of Retaining wall at 18 and 19 no. ward

 

250. Construction of R.C.C. R/W At Abdul Latif Hat Kola Khal  at 18 no ward

 

185.50

251. Construction of R.C.C. R/W At Isak Bridge  at 18 no ward

 

139.57

252. Construction of R.C.C. R/W At Near Abdul Hakim Road and Omar Ibne Abdul Aziz Mosque  at 18 no ward

 

273.50

253. Construction of Birja Khal All Side R/W at 19 no ward

 

273.00

Sub-total (250-253)

871.57

Construction/Re-construction of 5 nos. of Retaining wall at 23,24,26 and 27 no. ward

 

254. Construction of Lal Miya Chara R/W  at 23 no ward

 

165.00

255. Construction of R/W At Nasir Khal Chora at 24 no ward

 

176.62

256. Construction of Mohesh Khal R/W (Part) at 26 no ward

 

636.85

257. Construction of  Diversion Khal R/W at 26 no ward

 

404.11

258. Construction Of Retaining wall ofNasir Kha, CDA R/A Road No-01 At 27 ward

 

273.51

Sub-total (254-258)

1656.09

 

Construction/Re-construction of 4 nos. of Retaining wall at 30,31,33, and 34 no. ward

 

259. Construction of Malum Mashjid Big Drain All Side R/W at 30 no ward

 

176.62

260. Construction of Manohor khli R/W  at 31 no ward

 

135.86

261. Construction Of Retaining Wall Beside Bundle Khal at 33 no ward

 

436.69

262. Construction of Monium Bibi Khal R/W at 34 no ward

 

305.00

Sub-total (259-262)

1054.17

Construction/Re-construction of 6 nos. of Retaining wall at 37,38,39,40 and 41 no. ward

 

263. Construction of Dalusha Majar Railway Khal at 37 no ward

 

467.80

264. Construction of Mohes Khal By Lane Post Office Kahl  at 38 no ward

 

663.98

265. Construction of Saikat Khal And Mattailla Khal R/W Both Side at 39 no ward

 

861.57

266. Construction of Contoll Mor To Gupta Khal R/W at 40 no ward

 

585.00

267. Construction of Chodi Halda Nasir Para To See Beach Khal R/W  at 41 no ward

 

572.96

268. Construction of V.I.P. Road Circle To Komisaner Bari R/W at 41no ward

 

317.07

Sub-total (263-268)

3468.38

Retaining wall

13550.30

Construction of 5 nos. of drain at 2,4,5 and 8 no. ward

 

269. Construction Of Drain At Biozoid Busraqmi Road at 2 no ward

 

178.34

270. Construction of Chandgoa R/A A Block Front Side Big Drain  at 4 no ward

 

238.25

271. Construction of F.I.D.C. Road Drain at 5 no ward

 

212.25

272. Construction of Purbakon Office To Shopping Complex Box Culvert CDA Avenue East South Side Drain at 8 no ward

 

212.00

273. Construction of Hotel Lot-In 02 No Gate Grave Yard CDA Avenue West Side Drain at 8 no ward

 

212.00

 

1052.84

Construction of 9 nos. of drain at 9,10,11 and 13 no. ward

 

274. Construction of Bisaw Conali Drain at 9 no ward

 

212.00

275. Construction of Akbarsha Society Chora/Drainat 9 no ward 

 

212.00

276. Construction of Azin Talukder, Kala Miya, Dr. Bari, Agrapara And Doya Para Drain at 10 no ward

 

295.71

277. Construction of Isan Bari, Munshi Para  Drain at 10 no ward

 

181.00

278. Construction of Asaza Para, East Das Road Drain at 10 no ward

 

176.04

279. Construction of Sodu Chowduri Drain at 11 no ward

 

405.75

 

 

280. Construction of Floora Pass Roas Drain at 13 no ward

 

421.70

281. Construction of Krisna Chora Xen Coloni Joutala Ambagan Big Drain at 13 no ward

 

144.65

282. Construction of Desil Coloni Mashzid Side Drain at 13 no ward

 

942.00

Sub-total

2990.85

Construction of 6 nos. of drain at 14 and 15no. ward

 

283. Construction of Moti Jarna Road Drain at 14 no ward

 

72.66

284. Construction of Chan Miya Road Drain at 14 no ward

 

74.56

285. Construction of Drain of Baggona Road Side  at14 no ward

 

74.61

286. Construction of Drain of LalKhan Bazar Mor To Road East Side  at 15 no ward

 

151.69

287. Construction of R.C.C. Drain of Golpahar Mor To Badsha Miya Chowdury Road   at 15 no ward

 

139.07

288. Construction of Hill View R/A To Probatok Mor Drain at 15 no ward

 

89.00

Sub-total

601.59

Construction of 12 nos. of drain at 21 and 22 no. ward

 

289. Construction of R.C.C. Drain of Panchlish Thana South Side  at 16 no ward (Ch0-0.76Km)

 

229.00

290. Construction of R.C.C. Drain at K.B. Fazlul Qader   at 16 no ward      (Ch0-00 to 1-600 Km)

 

317.53

291. Construction of Drain at Tupiwalay Para Big  at 16 no ward  (Ch0-0.18 Km)

 

113.00

292. Construction of  Drain of Chowk bazar To Donir Pul Joy Nogar 02 No at 16 no ward (Ch0-0.288 Km) 

 

173.00

293. Construction of Drain At Tazurmar Jora at 17 no ward

 

268.94

294. Construction of Drain At Rasul Bag R/A 'A' Block at 17 no ward

 

142.66

295. Construction of Drain At Shah Amanat H/S Road

 

138.00

296. Construction of Drain Beside Mostofa Bag And Shalbon R/A at 17 no ward

 

117.01

297. Construction of Drain At Younus Road (Up To Birja Khal) at 17 no ward

 

107.83

298. Construction of Drain at Match Factory Road    at 19 no ward

 

164.50

299. Construction of Drain at Mirja Khal  at 19 no ward

 

134.00

300. Construction of Drain of Myder Mill at 19 no ward

 

107.00

 

2012.47

Construction of 5 nos. of drain at 21 and 22 no. ward

 

301. Construction of R.C.C. Drain K.B.Abdul Souter Road  at 21 no ward

 

87.31

302.Construction of Drain of Dewngi Pukur Lane  at 21 no ward

 

58.77

303. Construction of Drain of Tulaloli  at 22 no ward

 

196.81

304. Construction of Drain of  Goil Para and Mohilla collage road at 22 no ward

 

324.00

 

666.89

 

Construction of 5 nos. of drain at 24 and 25 no. ward

 

305. Construction of Drain of Rongi Para  at 24 no ward

 

115.12

306. Construction of Drain At Mollpara at 24 no ward

 

206.12

307. Construction of  Drain at Hasan Sha Majar Road

 

58.45

308. Construction of Drain Port Conneting Road  at 25 no ward

 

93.37

309. Construction of Drain At Halishar Katcha Road at 25 no ward

 

98.19

 

571.25

Construction of 4 nos. of drain at 26 and 27 no. ward

 

310. Construction of drain of Notun Para, Sundari Para, C.S.D. Gowdown To B.G.B. East Sundari Para at 26 no ward

 

97.50

311. Construction of drain of Chowchala To Beri Badth, M.A.Aziz Para, Molla Para, Neway Para, Patchghar Para at 26no ward

 

67.00

312. Construction of drain of 'B' Block- By Lane Drain at 26 no ward

 

314.44

313. Construction of Drain At C.D.A. R/A at 26 no ward

 

95.27

 

574.21

Construction of 6 nos. of drain at 28,29,30 & 31 no. ward

 

314.Construction of Drain by the side of Agrabad Dehbar at 28 no ward

 

102.87

315. Construction of drain of D.T. Road Side Drain at 29 no ward

 

116.56

316. Construction of drain of South Nalapara  at 30 no ward

 

165.62

317. Construction of drain of South Nalapara   at 30 no ward

 

208.18

318. Construction of drain of  Station Road  at 31 no ward

 

433.22

319.Construction of drain of Kobi Nazrul Islam Drain at 31 no ward

 

83.66

 

1110.11

Construction of 10 nos. of drain at 32 and 33 no. ward

 

320. Construction of drain of K.C.Dey Road  at 32 no ward

 

128.50

321. Construction of drain of Abdull Aziz Road  at 32 no ward

 

196.56

322. Construction of drain of  Lal Deeghi Par  at 32 no ward

 

125.60

323. Construction of drain of Jail Road  at 32 no ward

 

87.33

324. Construction of drain at Azadi Office Back Side Bos at 32 no ward

 

54.35

325. Construction of drain at  Dooduya Mondir Road Drain  at 32 no ward

 

146.70

326. Construction of drain at Sarowardi Road  at 32 no ward

 

155.60

327. Construction Of RCC Drain Beside Mohim Das Road at 33 no ward

 

199.72

328. Construction Of RCC Drain Beside Yakub Nagar Road at 33 no ward

 

240.17

329. Construction Of Drain And Slab Beside Al Karin Road at 33 no ward

 

250.65

Sub-total

1585.18

Construction of 7 nos. of drain at 35,37,38 and 39 no. ward

 

330. Construction Of RCC Drain Inside Bakalia City Corporation Stadium at 35 no ward

 

250.00

331. Construction of drain at Jalil Mofazal Collge Road, Danga Chowdury Road, Rupnagor Road Side Drain at 37 no ward

 

83.99

332. Construction of drain at Concelor Bari To Railway Khal Drain at 37 no ward

 

83.99

333. Construction of drain at 38 No South Middel Halisahar Stand Road Drain at 38 no ward

 

124.50

334. Construction of drain Abdul Kalad Road Drain at 38 no ward

 

105.59

335. Construction of drain Akmal Ali Road And By Lane at 39no ward

 

297.00

336. Construction of drain at S.Alam And B.Alam Road And By Lane at 39 no ward

 

184.00

Sub-Total Drain

1129.07

Total Drain

12294.46

Construction/Re-Construction of 3nos. of R.C.C girder Bridge at 2 no. ward

 

337. Construction Of Bridge At Tupani Road at 2 no ward

 

113.00

338. Construction Of Bridge At Jamshed Sha Road at 2 no ward

 

116.00

339. Construction Of Bridge rt At Sharsha Conony at 2 no ward

 

240.00

Sub-total Bridge

469.00

Construction/Re-Construction of 4 nos. of R.C.C girder Bridge at 4 no. & 6 no. ward

 

340. Construction of Dom Khal Bridge And Aproach road with gard wall  at 4 no ward

 

351.86

341. Construction of Bridge of Near Jongi Shah Mazar at 6 no ward

 

212.00

342. Construction of Bridge Of Haris Shah Mazar at 6 no ward

 

205.50

343. Construction of Bridge of Haizzar Pool at 6 no ward

 

205.50

Sub-total Bridge

974.86

Construction/Re-Construction of 4 nos. of R.C.C girder Bridge at 9,16,18 no. ward

 

344. Construction of Bridge at Railway Akbarsha Society at 9 no ward

 

314.35

345. Construction of Donir Pul Bridge  with approach road and R.C.C Drain at 16 no ward

 

408.00

346. Re-Construction Of R.C.C. Girder Brige At Hat Kola Road at 18  no ward

 

350.00

347. Re-Construction Of R.C.C. Bridge And Aproach  At K.B.Aman Ali Road at 18 no ward

 

140.00

Sub-total Bridge

1212.35

Construction/Re-Construction of 6 nos. of R.C.C girder Bridge at 20,24,30,31 no. ward

 

348. Construction of Shirasdolya Road Bridge  And Aproach  at 20 no ward

 

125.00

349. Construction of Culvert At Mollpara With Apoach Road at 24 no ward

 

255.05

 

350. Re-Construction Of Girder Bridge At Sadorgat Road Near Coustom House at 30 no ward

 

272.08

351. Re-Construction Of Girder Bridge Approach At Sadorgat Road Near Majirgat Road at 30 no ward

 

271.80

352. Re-Construction Of Jala Para Bridge And Aproach at 30no ward

 

145.06

353. Construction of Monohorkhli Bridge And Aproach  at 31 no ward

 

162.99

Sub-total Bridge

1231.975

Construction/Re-Construction of 5 nos. of R.C.C girder Bridge at 10,26,35,36,38 no. ward

 

354. Re-Construction Of Korbani gonj R.C.C girder Bridge And Aproach  at 35 no ward

 

100.00

355. Construction of 38 No Halisahar Stand Road Khal Over R.C.C. Bridge at 38 no ward

 

132.09

356. Construction of Bridge over Mohesh khall of Artiliary  at 26 no ward

 

450.10

357. Construction of Bridge over nazir khal with approach road at 10 no ward

 

418.10

358. Cons. Of Thandamiah Briidge including approach road under 36 No gosaildanga ward (Ch.0-00 to 0-610 Km.)

214.25

Sub-total Bridge

1314.54

Total R.C.C Girder bridge (22 Nos)

5202.72

Construction of 4 nos. Culvert at 7no. Ward &11 no. ward

 

359. Construction of Sunniya Madrasa Road, Box Culvert And Sodar Khal  at 7no ward

 

147.50

360. Construction of I Bock Box Calvert at 11 no ward

 

354.75

361. Construction of A Bock Box Calvert at 11 no ward

 

349.35

362.Construction of J Bock Box Calvert at 11 no ward

 

442.37

Sub-Total R.C.C Culvert(359-362)

1293.97

363.Utility shifting (Electrical,Wasa and Gas)

1052.00

Total works Procurement

70569.94

C. Physical Contingency (1%)

705.70

D. Price Contingency (0.5%)

352.85

Grand total

71628.49